Skip to main content

Min Specs for How You Facilitate, Not Just What You Design

I used to believe a tight run sheet was the mark of a serious host. Minute-by-minute. Every transition scripted. Every line of the invitation written out in advance.

Then I started asking myself the question I'd normally ask about any Min Specs design: what here is a must-do, and what is just habit dressed up as rigor?

The habit I mistook for professionalism

A detailed script felt safe. If something went wrong, I could point to the plan and say I'd prepared. But that plan was protecting me, not the group.

Min Specs asks you to cut until only the essentials remain: the must-dos, the must-not-dos, nothing else. I'd applied that to session design for years. I'd never turned it on my own practice as a host.

What actually has to stay

Some moves are non-negotiable. Not because a script says so, but because the structure doesn't work without them.

Divergence has to happen before convergence. Skip it, and what the group converges on is thinner than what people actually think. The flow of a structure has to hold, round after round. A check-in belongs at the start, so people arrive as themselves, not as a role. And a pause belongs somewhere in the middle, because thinking needs room, not just talking time.

Those are must-dos. Cut them, and it isn't the structure anymore. It's an agenda with better fonts.

What has to go

The must-not-do is simpler to name, and harder to admit: don't hold the script when the group needs something else.

A group that needs five more minutes of divergence doesn't care that my plan says convergence starts at 10:40. A group that's gone quiet doesn't need me to read the next prompt on time. It needs me to notice.

Kept it. Cut it.

Cut it: the minute-by-minute timing script. Exact wording for every transition, written out like a play.

Kept it: the core movement of each phase, open it wide, narrow it down, on purpose, in that order.

Cut it: a fixed script for the check-in question, word for word.

Kept it: the check-in itself. Something happens before the real work starts, every time.

Cut it: a rigid slot for the pause, timed to the minute.

Kept it: the pause exists somewhere. Where, I decide in the room.

Everything I cut was there to reassure me, not to serve the group. Everything I kept earns its place in the structure itself.

Your turn

Look at your own run sheet. Which lines are must-dos, and which ones are just there to make you feel ready?